Northern coverage

ANNA in the A1 Corridor.

Specialist technical service in La Moraleja, Valdebebas and northern Madrid.

ANNA's commitment

ANNA's commitment to northern Madrid.

We understand the demands and particular character of homes in the residential areas of the A1 Corridor. Our team of qualified technicians is dedicated to maintaining the comfort and efficiency of your home, delivering precise, discreet work to the highest standards of quality.

"Your peace of mind is our priority. We take care of every technical detail so all you have to do is enjoy your home."

Ducted air conditioning installation, ANNA

Coverage area

Service areas in the A1 Corridor.

Real figures

The municipalities and districts that make up the A1 Corridor.

Official data for the municipalities and districts where the localities we serve are located — not figures for each individual urbanisation or neighbourhood, which aren't published at that level of detail.

Alcobendas

123.222 residents (2025)

40.084 households (2021)

Hortaleza

195.017 residents (2022)

63.481 households (2015)

Fuencarral-El Pardo

246.281 residents (2022)

85.852 households (2015)

San Sebastián de los Reyes

97.330 residents (2025)

32.904 households (2021)

Algete

21.194 residents (2025)

6.723 households (2021)

Source: Statistics Institute of the Community of Madrid (Almudena) and Madrid City Council, based on the INE Population and Housing Census. Each locality may differ from its municipality or district average.

Services in this area

Technical solutions for your home in the A1 Corridor.

Comfort, safety and energy efficiency, with the same trusted team.

Electrical

Maintenance, repair and upgrades of electrical installations, consumer units and efficient lighting.

Learn more →

Climate control

Air conditioning and heating specialists for optimal thermal comfort all year round.

Learn more →

Energy

Energy optimisation, monitoring system installation and EV charging points.

Learn more →

What fails most often in this area

Technical diagnosis in the A1 Corridor.

Beyond the general cases, this is what we see most frequently in homes in this specific area.

Pool climate control and porch dehumidification in chalets

Cause
The pool's heat pump and the glazed porch's dehumidifier are usually installed separately, without being integrated into the home's overall electrical project.
Effect
This creates consumption peaks that coincide with the indoor climate control and trip the residual current device, and poorly sized dehumidification leaves condensation and mould in the enclosure.
Prevention
Include the pool and porch's electrical consumption in the same load study as the rest of the home from the outset of the project, not as a later addition — not to be confused with the pool's heat-generation system, which Spanish regulations (RITE) require to stay independent from the rest of the building, with no fossil fuels or non-renewable energy if the pool is uncovered.
ANNA's diagnosis
In the ANNA Passport we log the actual consumption of each pool and porch circuit to confirm the consumer unit and protection devices can handle it with margin to spare, and we check that the pool's climate-control system complies with the RITE.

Duct zoning by orientation in terraced penthouses

Cause
The ducted system is zoned the same way throughout the home, without adjusting airflow to the actual solar load of rooms facing the terrace.
Effect
Rooms facing the terrace fall short of comfortable in summer while the rest of the home is overcooled, and the unit works harder than it needs to.
Prevention
Adjust airflow and zoning to the home's actual orientation, not just the floor area of each room.
ANNA's diagnosis
We measure airflow and temperature drop at each diffuser and readjust the zoning dampers as part of the maintenance SLA, without touching the outdoor unit.

Electric vehicle charging point: chalet versus communal garage

Cause
In a chalet, the charger is often connected directly to the main consumer unit without a dedicated circuit; in flats with a communal garage, everything depends on whether the pre-wired infrastructure required by ITC-BT-52 exists, which isn't always included in developments already handed over.
Effect
In a chalet, there's a risk of trips and overload at peak domestic hours; in a community, it means paperwork with the residents' association and limited power capacity in the meter room.
Prevention
Request a study of available power capacity, and of the connection point under ITC-BT-52 where it applies, before buying the charger.
ANNA's diagnosis
ANNA produces the load study and technical project for the charging point, both for an individual circuit in a chalet and for a collective installation in a communal garage.

A1 Corridor

When something happens in your home, you don't need to know what it is.
ANNA handles the rest.

918 59 17 22